MASHHAD RING ROAD

This project was built with a width of 130 meters in two crossing ways, each with a width of 20.15 meters, in an average balance of 3 meters below the land, with an approximate length of 7 kilometers, and by expending a capital of Rls. 320,000,000,000.

In its middle 12-meter green space, constructing a rapid transit. 100-Meter Highway and Grade Separation of Khayyam Square were exploited in Hazrate Ali’s birthday. Green spaces, lateral ways and Abootaleb Grade Separation and Grade Separation of Khine Arab U Turn are other projects that are under construction.